Temperature monitoring relay

line
Product category:
Temperature monitoring relay
Brand:
Type of electric connection:
Rated control supply voltage at AC 50 Hz(V):
Rated control supply voltage at AC 60 Hz(V):
Rated control supply voltage at DC(V):
Voltage type for actuating:
Width(mm):
With detachable clamps:
Number of measuring circuits:
Error registration possible:
External reset possible:
Number of contacts as normally closed contact:
Number of contacts as normally open contact:
Number of contacts as change-over contact:
Height(mm):
Depth(mm):
Temperature measuring range(°C):
Resistance measuring range(Ohm):
Voltage type of supply voltage:
Supply voltage AC 50 Hz(V):
Supply voltage AC 60 Hz(V):
Supply voltage DC(V):
Connection type auxiliary circuit:
Voltage type (operating voltage):
Operating voltage at AC 50 Hz(V):
Operating voltage at AC 60 Hz(V):
Operating voltage at DC(V):
Rated switch current(A):

Results 561 - 570 (of 888)

line
Omron E5GC1003G Temperature monitoring relay
Stock: 0.
  Estimated lead time: 50 days.


Quantity items
Add to cart
Omron E5GC1004E Temperature monitoring relay
Stock: 0.
  Estimated lead time: 20 days.


Quantity items
Add to cart
Omron E5GC1012F Temperature monitoring relay
Stock: 0.
  Estimated lead time: 20 days.


Quantity items
Add to cart
Omron E5GC1028B Temperature monitoring relay
Stock: 0.
  Estimated lead time: 50 days.


Quantity items
Add to cart
Omron E5GC1006A Temperature monitoring relay
Stock: 0.
  Estimated lead time: 6 days.


Quantity items
Add to cart
Omron E5GC1014B Temperature monitoring relay
Stock: 0.
  Estimated lead time: 50 days.


Quantity items
Add to cart
Omron E5GC1030D Temperature monitoring relay
Stock: 0.
  Estimated lead time: 50 days.


Quantity items
Add to cart
Omron E5GC1005C Temperature monitoring relay
Stock: 0.
  Estimated lead time: 20 days.


Quantity items
Add to cart
Omron E5GC1013D Temperature monitoring relay
Stock: 0.
  Estimated lead time: 20 days.


Quantity items
Add to cart
Omron E5GC1029M Temperature monitoring relay
Stock: 0.
  Estimated lead time: 50 days.


Quantity items
Add to cart