Full catalog
Categorized products only
Corrugated plastic hose

Results 21 - 30 (of 778)

Helukabel Corrugated plastic hose HELUcond PA6-F Grey NW 37 FEINGERILLT (25m Ring)
Product details
EUR €
244,58
per 25 meter
Excluding VAT
Excluding VAT
Stock:
0.
Estimated lead time: 9 days.
Helukabel Corrugated plastic hose HELUcond PA6-F Grey NW 50 FEINGERILLT (25m Ring)
Product details
EUR €
354,53
per 25 meter
Excluding VAT
Excluding VAT
Stock:
0.
Estimated lead time: 9 days.
Helukabel Corrugated plastic hose HELUcond PE-F NW10 sw ID: 9,8 mm AD: 12,7 mm (50m Ring)
Product details
EUR €
57,86
per 50 meter
Excluding VAT
Excluding VAT
Stock:
0.
Estimated lead time: 9 days.
Helukabel Corrugated plastic hose HELUcond PE-F NW12 sw ID: 11,6 mm AD: 15,6 mm (50m Ring)
Product details
EUR €
73,08
per 50 meter
Excluding VAT
Excluding VAT
Stock:
0.
Estimated lead time: 9 days.
Helukabel Corrugated plastic hose HELUcond PE-F NW17 sw ID: 16,3 mm AD: 20,8 mm (50m Ring)
Product details
EUR €
92,24
per 50 meter
Excluding VAT
Excluding VAT
Stock:
0.
Estimated lead time: 9 days.
Helukabel Corrugated plastic hose HELUcond PE-F NW23 sw ID: 22,9 mm AD: 27,9 mm (50m Ring)
Product details
EUR €
148,80
per 50 meter
Excluding VAT
Excluding VAT
Stock:
0.
Estimated lead time: 9 days.
Helukabel Corrugated plastic hose HELUcond PE-F NW29 sw ID: 28,9 mm AD: 34,0 mm (25m Ring)
Product details
EUR €
109,33
per 25 meter
Excluding VAT
Excluding VAT
Stock:
0.
Estimated lead time: 9 days.
Helukabel Corrugated plastic hose HELUcond PE-F NW37 sw ID: 33,5 mm AD: 41,5 mm (25m Ring)
Product details
EUR €
143,42
per 25 meter
Excluding VAT
Excluding VAT
Stock:
0.
Estimated lead time: 9 days.
Helukabel Corrugated plastic hose HELUcond PE-F NW50 sw ID: 45,2 mm AD: 53,4 mm (25m Ring)
Product details
EUR €
192,92
per 25 meter
Excluding VAT
Excluding VAT
Stock:
0.
Estimated lead time: 9 days.
Helukabel Corrugated plastic hose HELUcond PA6-F Black NW 10 FEINGERILLT (50m Ring)
Product details
EUR €
92,30
per 50 meter
Excluding VAT
Excluding VAT
Stock:
0.
Estimated lead time: 9 days.