Hateha Energy distributor for construction site

line
Product category:
Energy distributor for construction site
Brand:
Hateha
Model:
Rated current(A):
Number of CEE socket outlets 16 A / 400 V / 5P:
Number of CEE socket outlets 32 A / 400 V / 5P:
Width(mm):
Number of CEE socket outlets 63 A / 400 V / 5P:
Number of socket outlets with protective contact (type F):
Main switch:
Main switch rated current(A):
Degree of protection (IP):
Rated voltage:
Height(mm):
Depth(mm):
Number of CEE socket outlets 16 A / 24 V / 2P:
Number of CEE socket outlets 16 A / 230 V / 3P:
Number of CEE socket outlets 16 A / 400 V / 4P:
Number of CEE socket outlets 32 A / 400 V / 4P:
Number of miniature circuit breakers:
Number of poles main switch:
Number of earth leakage switches 10 mA:
Number of earth leakage switches 30 mA:
Number of earth leakage switches 300 mA:
Material housing:
Number of CEE socket outlets 125A / 400 V / 5P:
Number of socket outlets Swiss standard type 13:
Number of socket outlets Swiss standard type 15:
Number of socket outlets Swiss standard type 23:
Number of socket outlets Swiss standard type 25:

Results 21 - 29 (of 29)

line
Hateha 21.M63-030006-S1 Energy distributor for construction site
Stock: 0.
  Estimated lead time: 11 days.


Quantity items
Add to cart
Hateha 21.R32-011-1 Energy distributor for construction site
Stock: 0.
  Estimated lead time: 18 days.


Quantity items
Add to cart
Hateha 21.R32-011-2 Energy distributor for construction site
Stock: 0.
  Estimated lead time: 18 days.


Quantity items
Add to cart
Hateha 21.R32-011-4 Energy distributor for construction site
Stock: 0.
  Estimated lead time: 18 days.


Quantity items
Add to cart
Hateha 21.R32-062-4 Energy distributor for construction site
Stock: 0.
  Estimated lead time: 11 days.


Quantity items
Add to cart
Hateha 21.T42-11 Energy distributor for construction site
Stock: 0.
  Estimated lead time: 18 days.


Quantity items
Add to cart
Hateha 21.T42-32 Energy distributor for construction site
Stock: 0.
  Estimated lead time: 18 days.


Quantity items
Add to cart
Hateha 21.T42-62 Energy distributor for construction site
Stock: 0.
  Estimated lead time: 18 days.


Quantity items
Add to cart
Hateha 21.TC11-12 Energy distributor for construction site
Stock: 0.
  Estimated lead time: 18 days.


Quantity items
Add to cart