Patch cord for plug-in building installation

line
Product category:
Patch cord for plug-in building installation
Brand:
Rated voltage(V):
Rated current(A):
Number of poles:
Degree of protection (IP):
Type of finished cable:
Type side 1:
Type side 2:
Conductor end treatment:
Total length(mm):
Mechanical coding:
Colour coding/contact insert:
Colour housing:
Dismantle length(mm):
Strip length(mm):
Colour outer sheath:
Pole codification:
Nominal cross section conductor(mm²):
Insulating piece permanent temperature-resistant(°C):
Cable permanent temperature-resistant to(°C):
Halogen free:
Fire load(kWh):
Surface treatment contacts:
Pollution degree:
Continuity resistor(mOhm):
Rated surge voltage(kV):
Length(mm):
Cable type:
Cable diameter(mm):
Locking mechanism:
Max. operating temperature at conductor(°C):
:
:
:
:
Material housing:
Contact material:

Results 51 - 60 (of 6048)

line
Wago 891-8992/205-307 Patch cord for plug-in building installation
Stock: 0.
  Estimated lead time: 9 days.


Quantity items
Add to cart
Wago 891-8992/205-305 Patch cord for plug-in building installation
Stock: 0.
  Estimated lead time: 9 days.


Quantity items
Add to cart
Wago 891-8994/205-303 Patch cord for plug-in building installation
Stock: 0.
  Estimated lead time: 9 days.


Quantity items
Add to cart
Wago 771-9993/006-301 Patch cord for plug-in building installation
Stock: 0.
  Estimated lead time: 9 days.


Quantity items
Add to cart
Wago 771-9993/106-102 Patch cord for plug-in building installation
Stock: 0.
  Estimated lead time: 9 days.


Quantity items
Add to cart
Wago 771-9993/006-201 Patch cord for plug-in building installation
Stock: 0.
  Estimated lead time: 9 days.


Quantity items
Add to cart
Hager G4755 Patch cord for plug-in building installation
Stock: 0.
  Estimated lead time: 6 days.


Quantity items
Add to cart
Siemens 6GT28910PH50 Patch cord for plug-in building installation
Stock: 0.
  Estimated lead time: 7 days.


Quantity items
Add to cart
Hager G4721 Patch cord for plug-in building installation
Stock: 0.
  Estimated lead time: 6 days.


Quantity items
Add to cart
Hager G4731 Patch cord for plug-in building installation
Stock: 0.
  Estimated lead time: 6 days.


Quantity items
Add to cart