Sensor/actor patch cord

line
Product category:
Sensor-actuator patch cord
Brand:
Number of poles:
Type of electrical connection, field-sided:
Type of plug-in contact, field sided:
Positioning cable feed, field-sided:
Type of electrical connection, box-sided:
Type of plug-in contact, box-sided:
Positioning cable feed, box-sided:
Cable length(m):
Material of cable sheath:
Halogen free:
Colour cable sheath:
With LED indication:
Screened:
Type of cable:
Vulcanize:
Material contact body:
Material of contact surface:
Permitted cable outer temperature after assembling without vibration(°C):
Permitted cable outer temperature during assembling/handling(°C):
Rated current In(A):
Rated voltage(V):
Continuity resistor(mOhm):
Length(mm):
Colour:
Degree of protection (IP):
Cable type:

Results 31 - 40 (of 54801)

line
Ifm EVC049 Sensor-actuator patch cord
Stock: 0.
  Estimated lead time: 7 days.


Quantity items
Add to cart
Ifm EVC04A Sensor-actuator patch cord
Stock: 0.
  Estimated lead time: 5 days.


Quantity items
Add to cart
Ifm EVC052 Sensor-actuator patch cord
Stock: 0.
  Estimated lead time: 9 days.


Quantity items
Add to cart
Ifm EVC053 Sensor-actuator patch cord
Stock: 0.
  Estimated lead time: 9 days.


Quantity items
Add to cart
Ifm EVC057 Sensor-actuator patch cord
Stock: 0.
  Estimated lead time: 7 days.


Quantity items
Add to cart
Ifm EVC058 Sensor-actuator patch cord
Stock: 0.
  Estimated lead time: 14 days.


Quantity items
Add to cart
Ifm EVC060 Sensor-actuator patch cord
Stock: 0.
  Estimated lead time: 11 days.


Quantity items
Add to cart
Ifm EVC062 Sensor-actuator patch cord
Stock: 0.
  Estimated lead time: 6 days.


Quantity items
Add to cart
Ifm EVC064 Sensor-actuator patch cord
Stock: 0.
  Estimated lead time: 5 days.


Quantity items
Add to cart
Ifm EVC068 Sensor-actuator patch cord
Stock: 0.
  Estimated lead time: 11 days.


Quantity items
Add to cart