Full catalog
Categorized products only
Terminal sleeve for protective hose

Results 11 - 20 (of 233)

Helukabel Terminal sleeve for protective hose EEM AD36 (M) D: 31x36mm, I: 29,5 mm (Ø 36mm) (25 Stuks)
Product details
EUR €
81.244,20
per 100 items
Excluding VAT
Excluding VAT
Stock:
0.
Estimated lead time: 9 days.
Helukabel Terminal sleeve for protective hose EEM AD45 (M) D: 40x45mm, I: 38,0 mm (Ø 45mm) (20 Stuks)
Product details
EUR €
108.837,30
per 100 items
Excluding VAT
Excluding VAT
Stock:
0.
Estimated lead time: 9 days.
Helukabel Terminal sleeve for protective hose EEM AD56 (M) D: 51x56mm, I: 49,0 mm (Ø 65mm) (10 Stuks)
Product details
EUR €
228.742,80
per 100 items
Excluding VAT
Excluding VAT
Stock:
0.
Estimated lead time: 14 days.
Helukabel Terminal sleeve for protective hose EEK PG7 (50 Stuks)
Product details
EUR €
35.165,40
per 100 items
Excluding VAT
Excluding VAT
Stock:
0.
Estimated lead time: 9 days.
Helukabel Terminal sleeve for protective hose INNENTÜLLE EEK PG11 (50 Stuks)
Product details
EUR €
37.784,10
per 100 items
Excluding VAT
Excluding VAT
Stock:
0.
Estimated lead time: 9 days.
Helukabel Terminal sleeve for protective hose INNENTÜLLE EEK PG 21 (25 Stuks)
Product details
EUR €
46.620,60
per 100 items
Excluding VAT
Excluding VAT
Stock:
0.
Estimated lead time: 9 days.
Helukabel Terminal sleeve for protective hose INNENTÜLLE EEK PG 36 (25 Stuks)
Product details
EUR €
79.144,08
per 100 items
Excluding VAT
Excluding VAT
Stock:
0.
Estimated lead time: 9 days.
Helukabel Terminal sleeve for protective hose INNENTÜLLE EEK PG 48 (10 Stuks)
Product details
EUR €
216.216,90
per 100 items
Excluding VAT
Excluding VAT
Stock:
0.
Estimated lead time: 9 days.
Helukabel Terminal sleeve for protective hose INNENTÜLLE EEK PG 29 (25 Stuks)
Product details
EUR €
73.813,80
per 100 items
Excluding VAT
Excluding VAT
Stock:
0.
Estimated lead time: 9 days.
Helukabel Terminal sleeve for protective hose INNENTÜLLE EEK PG 9 (50 Stuks)
Product details
EUR €
35.900,70
per 100 items
Excluding VAT
Excluding VAT
Stock:
0.
Estimated lead time: 9 days.