Building site lighting luminaire

line
Product category:
Building site lighting luminaire
Brand:
Lamp type:
With light source:
Yes
Lamp holder:
Lamp power(W):
With socket outlet:
Material:
Nominal voltage(V):
With stand holder:
Degree of protection (IP):
Suitable for number of lamps:
Material housing:
With wheels:
No
With protective cover:
Material protective cover:
Energy efficiency class of the built-in lamp:
Rated life time L70/B10 at 25 °C(h):
Rated life time L70/B50 at 25 °C(h):
Rated life time L80/B10 at 25 °C(h):
Rated life time L80/B50 at 25 °C(h):
Rated life time L90/B10 at 25 °C(h):
Rated life time L90/B50 at 25 °C(h):
Degree of protection (NEMA):
Protection class:
Impact strength:
Suitable for lamp power(W):
Max. system power(W):
Rated luminous flux according to IEC 62722-2-1(lm):
Colour of light:
Colour temperature(K):
Colour rendering index CRI:
Type of wiring:
Number of poles:
Conductor cross section(mm²):
Connection type:
Length of connection cable(m):
Colour housing:
With stand:
Colour of stand:
:

Results 1 - 10 (of 23)

line
Cimco 111580 Building site lighting luminaire
Stock: 0.
  Estimated lead time: 7 days.


Quantity items
Add to cart
Schneider Electric IMT33100 Building site lighting luminaire
Stock: 0.
  Estimated lead time: 6 days.


Quantity items
Add to cart
Schneider Electric IMT33101 Building site lighting luminaire
Stock: 0.
  Estimated lead time: 6 days.


Quantity items
Add to cart
Schneider Electric IMT33107 Building site lighting luminaire
Stock: 0.
  Estimated lead time: 6 days.


Quantity items
Add to cart
Schneider Electric IMT33108 Building site lighting luminaire
Stock: 0.
  Estimated lead time: 6 days.


Quantity items
Add to cart
Schneider Electric IMT33094 Building site lighting luminaire
Stock: 0.
  Estimated lead time: 6 days.


Quantity items
Add to cart
Schneider Electric IMT47225 Building site lighting luminaire
Stock: 0.
  Estimated lead time: 6 days.


Quantity items
Add to cart
Schneider Electric IMT47239 Building site lighting luminaire
Stock: 0.
  Estimated lead time: 6 days.


Quantity items
Add to cart
Schneider Electric IMT47271 Building site lighting luminaire
Stock: 0.
  Estimated lead time: 6 days.


Quantity items
Add to cart
Schneider Electric IMT47238 Building site lighting luminaire
Stock: 0.
  Estimated lead time: 6 days.


Quantity items
Add to cart