Light control unit for bus system

line
Product category:
Light control unit for bus system
Brand:
Bus system KNX:
Bus system KNX radio:
No
Bus system radio frequent:
Bus system LON:
No
Bus system Powernet:
No
Other bus systems:
Mounting method:
Width in number of modular spacings:
With bus connection:
Substation input:
Local operation/hand operation:
With LED indication:
Interface 1-10 V:
Number of inputs for light sensor:
Max. switching current (resistive load)(A):
Max. switching power(W):
Number of outputs:
Max. control current(mA):
Degree of protection (IP):
Radio frequent bidirectional:
No

Results 1 - 10 (of 11)

line
Schneider Electric Merten MTN646991 Light control unit for bus system
Stock: 0 item.
  Estimated lead time: 6 days.


Quantity item
Add to cart
Schneider Electric Merten MTN647091 Light control unit for bus system
Stock: 0 item.
  Estimated lead time: 6 days.


Quantity item
Add to cart
ABB Busch-Jaeger 2CDG110080R0011 Light control unit for bus system
Stock: 0 item.
  Estimated lead time: 6 days.


Quantity item
Add to cart
ABB Busch-Jaeger 2CDG110079R0011 Light control unit for bus system
Stock: 0 item.
  Estimated lead time: 6 days.


Quantity item
Add to cart
ABB Busch-Jaeger 2CDG110081R0011 Light control unit for bus system
Stock: 0 item.
  Estimated lead time: 12 days.


Quantity item
Add to cart
ABB Busch-Jaeger 2CDG110087R0011 Light control unit for bus system
Stock: 0 item.
  Estimated lead time: 12 days.


Quantity item
Add to cart
ABB Busch-Jaeger 2CDG110088R0011 Light control unit for bus system
Stock: 0 item.
  Estimated lead time: 12 days.


Quantity item
Add to cart
ABB Busch-Jaeger 2CDG110107R0011 Light control unit for bus system
Stock: 0 item.
  Estimated lead time: 29 days.


Quantity item
Add to cart
ABB Busch-Jaeger 2CDG110108R0011 Light control unit for bus system
Stock: 0 item.
  Estimated lead time: 29 days.


Quantity item
Add to cart
Hager TYB673B Light control unit for bus system
Stock: 0 item.
  Estimated lead time: 5 days.


Quantity item
Add to cart
  • 1
  • 2