UPS

line
Product category:
UPS
Brand:
Input voltage(V):
Bridging time full load(min):
Suitable for network-management:
Height(mm):
Width(mm):
Depth(mm):
Weight(kg):
USV- technology:
Construction type:
Primary frequency(Hz):
Number of phases primary:
Output voltage(V):
Secondary frequency(Hz):
Output effective power(W):
Output apparent power(VA):
Type of interface:
Number of phases secondary:
SNMP:
Voltage type:
Max. voltage distortion output (linear load)(%):
Output power factor:
Overall efficiency(%):
Efficiency in eco-mode(%):
Potential free switch contact:
Auto shut down function:
Input connection:
Number of output connections C13:
Number of output connections C19:
Number of output connections with protective contact (type F):
Number of output connections fixed connection:
Modular:
USB interface:
With communication interface RS-232:
Number of output connections French standard (Type E):
Power consumption(W):
Number of socket outlets French standard (Type E):
Number of socket outlets with protective contact (type F):

Results 1 - 10 (of 480)

line
Wago 787-870 UPS
Stock: 0.
  Estimated lead time: 9 days.


Quantity items
Add to cart
Wago 787-875 UPS
Stock: 0.
  Estimated lead time: 9 days.


Quantity items
Add to cart
Wago 787-875/000-012 UPS
Stock: 0.
  Estimated lead time: 19 days.


Quantity items
Add to cart
Wago 787-915 UPS
Stock: 0.
  Estimated lead time: 19 days.


Quantity items
Add to cart
Legrand 310081 UPS
Stock: 0.
  Estimated lead time: 9 days.


Quantity items
Add to cart
Legrand 310082 UPS
Stock: 0.
  Estimated lead time: 9 days.


Quantity items
Add to cart
Legrand 310121 UPS
Stock: 0.
  Estimated lead time: 9 days.


Quantity items
Add to cart
Legrand 310122 UPS
Stock: 0.
  Estimated lead time: 9 days.


Quantity items
Add to cart
Legrand 310123 UPS
Stock: 0.
  Estimated lead time: 14 days.


Quantity items
Add to cart
Legrand 310125 UPS
Stock: 0.
  Estimated lead time: 25 days.


Quantity items
Add to cart